Share:

E.TREMONT AVENUE over BRONX RIVER

Map 

Coordinates:
+40.83990, -73.87835
40°50'24" N, 73°52'42" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:E.TREMONT AVENUE over BRONX RIVER
Structure number:000000002242149
Location:OVER BRONX RIVER
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:42.0 ft. [12.8 m]
Total length:88.9 ft. [27.1 m]
Roadway width between curbs:100.1 ft. [30.5 m]
Deck width edge-to-edge:144.0 ft. [43.9 m]
Skew angle:25°
Owner:City or Municipal Highway Agency [04]
Year built:1897
Year reconstructed:1955
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: May 2015 

Status:Open, no restriction [A]
Average daily traffic:20,662 [as of 2007]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:36.0 tons [32.7 metric tons]
Inventory rating:22.0 tons [20.0 metric tons]
Sufficiency rating:69.8
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$4,831,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
May 201569.8Not deficientFairSatisfactorySatisfactory20662
May 201471.4Not deficientFairSatisfactorySatisfactory20662
May 201267.0Not deficientFairSatisfactorySatisfactory20700
June 201068.0Not deficientFairSatisfactorySatisfactory16193
May 200885.8Not deficientFairSatisfactorySatisfactory16193
May 200686.5Not deficientFairSatisfactorySatisfactory16193
May 200486.5Not deficientFairSatisfactorySatisfactory16193
May 200284.4Not deficientFairSatisfactorySatisfactory16193
April 200083.5Not deficientFairSatisfactorySatisfactory16193
April 199885.8Not deficientFairSatisfactorySatisfactory16193
April 199660.1Structurally deficientPoorFairPoor11900
May 199457.8Structurally deficientPoorFairPoor11900
May 199257.8Structurally deficientPoorFairPoor11900
May 199055.7Structurally deficientSeriousPoorPoor11900