E FORDHAM RD over GRAND CONCOURSE
Map
Coordinates:
+40.86244, -73.8971540°51'45" N, 73°53'50" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | E FORDHAM RD over GRAND CONCOURSE |
| Structure number: | 000000002242350 |
| Location: | IN FORDHAM |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 56.8 ft. [17.3 m] |
| Total length: | 63.0 ft. [19.2 m] |
| Roadway width between curbs: | 59.7 ft. [18.2 m] |
| Deck width edge-to-edge: | 163.1 ft. [49.7 m] |
| Vertical clearance below bridge: | 10.2 ft. [3.1 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1923 |
| Year reconstructed: | 1970 |
| Historic significance: | Bridge is eligible for the National Register of Historic Places [2] |
| Main span material: | Concrete [1] |
| Main span design: | Arch - Deck [11] |
| Deck type: | Not applicable [N] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 22,651 [as of 1998] |
| Truck traffic: | 9% of total traffic |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 44.4 tons [40.4 metric tons] |
| Inventory rating: | 16.5 tons [15.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 24.6 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $5,955,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 22,651 [as of 1998] |
| Truck traffic: | 5% of total traffic |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 42.9 tons [39.0 metric tons] |
| Inventory rating: | 16.0 tons [14.5 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 23.4 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $2,773,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 21,600 [as of 1970] |
| Truck traffic: | 10% of total traffic |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 44.6 tons [40.5 metric tons] |
| Inventory rating: | 16.1 tons [14.6 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 15.7 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $185,000 |