Share:

E FORDHAM RD over GRAND CONCOURSE

Map 

Coordinates:
+40.86244, -73.89715
40°51'45" N, 73°53'50" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:E FORDHAM RD over GRAND CONCOURSE
Structure number:000000002242350
Location:IN FORDHAM
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:56.8 ft. [17.3 m]
Total length:63.0 ft. [19.2 m]
Roadway width between curbs:59.7 ft. [18.2 m]
Deck width edge-to-edge:163.1 ft. [49.7 m]
Vertical clearance below bridge:10.2 ft. [3.1 m]
Owner:City or Municipal Highway Agency [04]
Year built:1923
Year reconstructed:1970
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Main span material:Concrete [1]
Main span design:Arch - Deck [11]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,651 [as of 1998]
Truck traffic:9% of total traffic
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:44.4 tons [40.4 metric tons]
Inventory rating:16.5 tons [15.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:24.6
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$5,955,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,651 [as of 1998]
Truck traffic:5% of total traffic
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:42.9 tons [39.0 metric tons]
Inventory rating:16.0 tons [14.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:23.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,773,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:21,600 [as of 1970]
Truck traffic:10% of total traffic
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:16.1 tons [14.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:15.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$185,000