FOSTER AVENUE over NYCTA BRIGHTON LN
Map
Coordinates:
+40.63429, -73.9626640°38'03" N, 73°57'46" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | FOSTER AVENUE over NYCTA BRIGHTON LN |
| Structure number: | 000000002243150 |
| Location: | IN KENSINGTON |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 68.9 ft. [21.0 m] |
| Total length: | 69.9 ft. [21.3 m] |
| Roadway width between curbs: | 39.7 ft. [12.1 m] |
| Deck width edge-to-edge: | 42.7 ft. [13.0 m] |
| Vertical clearance below bridge: | 14.1 ft. [4.3 m] |
| Owner: | Other Local Agencies [25] |
| Year built: | 1907 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Main span material: | Steel [3] |
| Main span design: | Girder and floorbeam system [03] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 15,382 [as of 2002] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 44.6 tons [40.5 metric tons] |
| Inventory rating: | 11.6 tons [10.5 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 25.9 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $1,752,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 15,071 [as of 1997] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 42.9 tons [39.0 metric tons] |
| Inventory rating: | 10.9 tons [9.9 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 28.5 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $808,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,000 [as of 1975] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 42.1 tons [38.3 metric tons] |
| Inventory rating: | 11.1 tons [10.1 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 3.4 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $210,000 |