Share:

ATLANTIC AVENUE over NY & ATLANTIC/LI, NYCTA

Map 

Coordinates:
+40.67587, -73.90292
40°40'33" N, 73°54'11" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:ATLANTIC AVENUE over NY & ATLANTIC/LI, NYCTA
Structure number:000000002243569
Location:IN EAST NEW YORK
Purpose:Carries highway over railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:49.9 ft. [15.2 m]
Total length:2503.1 ft. [762.9 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:53.2 ft. [16.2 m]
Vertical clearance above deck:13.8 ft. [4.2 m]
Vertical clearance below bridge:13.8 ft. [4.2 m]
Owner:City or Municipal Highway Agency [04]
Year built:1942
Year reconstructed:1989
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:75
Main spans material:Steel [3]
Main spans design:Girder and floorbeam system [03]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: June 2014 

Status:Open, no restriction [A]
Average daily traffic:36,729 [as of 2013]
Truck traffic:11% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Underclearances appraisal:Basically intolerable requiring high priority of replacement [2]
Roadway alignment appraisal:Better than present minimum criteria [7]
Scour condition:Bridge not over waterway. [N]
Operating rating:54.9 tons [49.9 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:60.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$194,851,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
June 201460.0Functionally obsoleteSatisfactorySatisfactoryFair36729
May 201260.1Functionally obsoleteSatisfactorySatisfactoryFair35800
May 201043.7Structurally deficientSatisfactoryFairPoor35905
September 200843.7Structurally deficientSatisfactoryFairPoor35905
July 200642.7Structurally deficientSatisfactorySatisfactoryPoor44188
July 200443.3Structurally deficientSatisfactorySatisfactoryPoor39000
June 200240.9Structurally deficientSatisfactorySatisfactoryPoor39000
March 200225.9Structurally deficientSatisfactorySatisfactoryPoor39000
March 200125.9Structurally deficientSatisfactorySatisfactoryPoor39000
August 199862.0Functionally obsoleteSatisfactorySatisfactoryFair39000
August 199615.9Not deficientPoorPoorPoor39000
June 199413.9Not deficientPoorPoorPoor39000
May 199213.9Not deficientPoorPoorPoor39000
July 199015.9Not deficientFairPoorPoor39000