Sixth Avenue over NY & Atlantic/L, NYCTA S
Map
Coordinates:
+40.63623, -74.0160340°38'10" N, 74°00'58" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | Sixth Avenue over NY & Atlantic/L, NYCTA S |
| Structure number: | 000000002243590 |
| Location: | IN BOROUGH PARK |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 102.0 ft. [31.1 m] |
| Total length: | 180.1 ft. [54.9 m] |
| Roadway width between curbs: | 51.5 ft. [15.7 m] |
| Deck width edge-to-edge: | 80.1 ft. [24.4 m] |
| Vertical clearance below bridge: | 14.1 ft. [4.3 m] |
| Skew angle: | 20° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1912 |
| Year reconstructed: | 2003 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 22.5 / HS 25 [9] |
| Number of main spans: | 2 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 12,189 [as of 1996] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Excellent [9 out of 9] |
| Superstructure condition: | Excellent [9 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Sufficiency rating: | 93.4 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $7,179,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 12,189 [as of 1996] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 18.9 tons [17.2 metric tons] |
| Inventory rating: | 9.9 tons [9.0 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 6.9 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $3,805,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 8,400 [as of 1969] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 35.9 tons [32.6 metric tons] |
| Inventory rating: | 16.1 tons [14.6 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 28.5 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $588,000 |