NEW UTRECHT AVE over N Y & ATLANTIC/LI, NYCTA

Map 

Coordinates:
+40.62653, -73.99688
40°37'36" N, 73°59'49" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:NEW UTRECHT AVE over N Y & ATLANTIC/LI, NYCTA
Structure number:000000002243660
Location:AT BOROUGH PARK
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:35.8 ft. [10.9 m]
Total length:36.1 ft. [11.0 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:65.3 ft. [19.9 m]
Vertical clearance above deck:16.4 ft. [5.0 m]
Vertical clearance below bridge:18.0 ft. [5.5 m]
Skew angle:26°
Owner:City or Municipal Highway Agency [04]
Year built:1905
Year reconstructed:2002
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,444 [as of 1998]
Truck traffic:13% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:93.6
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$9,267,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,444 [as of 1998]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:31.9 tons [29.0 metric tons]
Inventory rating:6.9 tons [6.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:40.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$634,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 1969]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:34.7 tons [31.5 metric tons]
Inventory rating:10.9 tons [9.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:4.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$114,000