WEST 46TH STREET over AMTRK W.SIDE CONN
Map
Coordinates:
+40.76245, -73.9942840°45'45" N, 73°59'39" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | WEST 46TH STREET over AMTRK W.SIDE CONN |
| Structure number: | 000000002245120 |
| Location: | IN MANHATTAN |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 32.8 ft. [10.0 m] |
| Total length: | 68.9 ft. [21.0 m] |
| Roadway width between curbs: | 33.8 ft. [10.3 m] |
| Deck width edge-to-edge: | 59.7 ft. [18.2 m] |
| Vertical clearance below bridge: | 20.0 ft. [6.1 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1934 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Number of main spans: | 2 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,944 [as of 2009] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 99.8 tons [90.7 metric tons] |
| Inventory rating: | 58.9 tons [53.5 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 73.7 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $2,021,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,965 [as of 1996] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 98.8 tons [89.8 metric tons] |
| Inventory rating: | 66.8 tons [60.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 66.7 |
| Recommended work: | Bridge deck rehabilitation with only incidental widening. [36] |
| Estimated cost of work: | $583,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 7,900 [as of 1969] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 57.0 tons [51.8 metric tons] |
| Inventory rating: | 22.3 tons [20.3 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 43.1 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $176,000 |