Share:

WEST DRIVE over BRIDLE OPP 64 ST

Map 

Coordinates:
+40.77108, -73.97805
40°46'16" N, 73°58'41" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WEST DRIVE over BRIDLE OPP 64 ST
Structure number:000000002246080
Location:SW END OF CENTRAL PARK
Purpose:Carries highway and pedestrian walkway over pedestrian/bicycle trail
Route classification:Minor Arterial (Urban) [16]
Length of largest span:24.0 ft. [7.3 m]
Total length:24.0 ft. [7.3 m]
Roadway width between curbs:44.3 ft. [13.5 m]
Deck width edge-to-edge:81.7 ft. [24.9 m]
Owner:City or Municipal Highway Agency [04]
Historic significance:Bridge is on the National Register of Historic Places [1]
Main span material:Masonry [8]
Main span design:Arch - Deck [11]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,282 [as of 1999]
Truck traffic:13% of total traffic
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:57.4 tons [52.2 metric tons]
Inventory rating:24.2 tons [22.0 metric tons]
Sufficiency rating:59.3
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$1,150,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,282 [as of 1999]
Truck traffic:4% of total traffic
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:56.9 tons [51.7 metric tons]
Inventory rating:26.8 tons [24.4 metric tons]
Sufficiency rating:74.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$531,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,700 [as of 1971]
Truck traffic:10% of total traffic
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:16.1 tons [14.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:29.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$52,000