CENTRAL DRIVE over TRANSV RD NO 1

Map 

Coordinates:
+40.76976, -73.97451
40°46'11" N, 73°58'28" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CENTRAL DRIVE over TRANSV RD NO 1
Structure number:000000002246100
Location:IN CENTRAL PARK
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:45.9 ft. [14.0 m]
Total length:45.9 ft. [14.0 m]
Roadway width between curbs:32.8 ft. [10.0 m]
Deck width edge-to-edge:129.9 ft. [39.6 m]
Vertical clearance below bridge:10.2 ft. [3.1 m]
Owner:City or Municipal Highway Agency [04]
Year built:1920
Historic significance:Bridge is on the National Register of Historic Places [1]
Main span material:Masonry [8]
Main span design:Arch - Deck [11]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,492 [as of 2001]
Truck traffic:13% of total traffic
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:43.0 tons [39.1 metric tons]
Inventory rating:11.8 tons [10.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:32.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,154,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,679 [as of 1994]
Truck traffic:10% of total traffic
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:41.9 tons [38.1 metric tons]
Inventory rating:10.9 tons [9.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:33.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$754,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,000 [as of 1991]
Truck traffic:10% of total traffic
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:11.1 tons [10.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:4.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$71,000