EAST DRIVE over TRANSVERS RD 1
Map
Coordinates:
+40.76900, -73.9728940°46'08" N, 73°58'22" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | EAST DRIVE over TRANSVERS RD 1 |
| Structure number: | 000000002246110 |
| Location: | SE END OF CENTRAL PARK |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 39.7 ft. [12.1 m] |
| Total length: | 45.9 ft. [14.0 m] |
| Roadway width between curbs: | 28.2 ft. [8.6 m] |
| Deck width edge-to-edge: | 129.9 ft. [39.6 m] |
| Vertical clearance below bridge: | 10.5 ft. [3.2 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1905 |
| Historic significance: | Bridge is on the National Register of Historic Places [1] |
| Main span material: | Masonry [8] |
| Main span design: | Arch - Deck [11] |
| Deck type: | Not applicable [N] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 274 [as of 2001] |
| Truck traffic: | 13% of total traffic |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 47.0 tons [42.7 metric tons] |
| Inventory rating: | 18.6 tons [16.9 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 58.1 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $3,469,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 354 [as of 1994] |
| Truck traffic: | 10% of total traffic |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 43.9 tons [39.9 metric tons] |
| Inventory rating: | 11.9 tons [10.8 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 19.7 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $740,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 18,700 [as of 1973] |
| Truck traffic: | 10% of total traffic |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 42.1 tons [38.3 metric tons] |
| Inventory rating: | 18.6 tons [16.9 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 32.3 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $68,000 |