102ND STREET over HAWTREE BASIN

Map 

Coordinates:
+40.65637, -73.83052
40°39'23" N, 73°49'50" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:102ND STREET over HAWTREE BASIN
Structure number:000000002248250
Location:102ND ST AT HOWARD BEACH
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:26.9 ft. [8.2 m]
Total length:85.0 ft. [25.9 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:58.1 ft. [17.7 m]
Vertical clearance below bridge:7.9 ft. [2.4 m]
Skew angle:29°
Owner:City or Municipal Highway Agency [04]
Year built:1997
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: July 2015 

Status:Open, no restriction [A]
Average daily traffic:2,568 [as of 2002]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:80.9 tons [73.5 metric tons]
Inventory rating:47.9 tons [43.5 metric tons]
Sufficiency rating:80.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$2,759,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
July 201580.0Not deficientGoodVery GoodGood2568
July 201379.0Not deficientGoodVery GoodGood2568
August 201179.0Not deficientGoodExcellentGood2568
August 200979.0Not deficientGoodExcellentGood2681
July 200779.0Not deficientGoodExcellentVery Good2568
July 200579.0Not deficientVery GoodExcellentExcellent2568
July 200379.0Not deficientExcellentExcellentExcellent2568
July 200179.0Not deficientExcellentExcellentExcellent2169
September 199979.0Not deficientExcellentExcellentExcellent2169
December 199785.7Not deficientVery GoodVery GoodGood1000
March 199727.0Structurally deficientSeriousSeriousSerious1000
July 199527.0Structurally deficientSeriousSeriousSerious1000
June 199427.0Structurally deficientSeriousPoorSerious1000
July 199328.0Structurally deficientPoorPoorSerious1000
August 199228.0Structurally deficientPoorPoorSerious1000
August 199117.0Structurally deficientPoorPoorSerious1000