Share:

WEIDRICK ROAD over GENESEE RIVER

Map 

Coordinates:
+42.10073, -77.93898
42°06'03" N, 77°56'20" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WEIDRICK ROAD over GENESEE RIVER
Structure number:000000002254400
Location:1.5 MI S OF WELLSVILLE
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:99.7 ft. [30.4 m]
Total length:102.7 ft. [31.3 m]
Roadway width between curbs:15.7 ft. [4.8 m]
Deck width edge-to-edge:16.7 ft. [5.1 m]
Owner:Town or Township Highway Agency [03]
Year built:1953
Year reconstructed:1995
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Wood or Timber [8]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,126 [as of 2009]
Truck traffic:2% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:32.9 tons [29.9 metric tons]
Inventory rating:19.9 tons [18.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:51.2
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$584,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,536 [as of 1998]
Truck traffic:8% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:44.9 tons [40.8 metric tons]
Inventory rating:21.9 tons [19.9 metric tons]
Sufficiency rating:54.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$265,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:560 [as of 1984]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:27.7 tons [25.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:33.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$986,000