ROBBINS ROAD over LABRADOR CREEK

Map 

Coordinates:
+42.73313, -76.02749
42°43'59" N, 76°01'39" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:ROBBINS ROAD over LABRADOR CREEK
Structure number:000000002268600
Location:1.5 MI N OF TRUXTON NAMLT
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:7.9 ft. [2.4 m]
Total length:22.0 ft. [6.7 m]
Roadway width between curbs:28.9 ft. [8.8 m]
Deck width edge-to-edge:32.2 ft. [9.8 m]
Owner:Town or Township Highway Agency [03]
Year built:1981
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Culvert [19]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: July 2015 

Status:Open, no restriction [A]
Average daily traffic:114 [as of 2012]
Truck traffic:7% of total traffic
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Meets minimum tolerable limits to be left in place as is [4]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Culvert condition:Large spalls, heavy scaling, wide cracks, considerable efflorescence or opened construction joint permitting loss of backfill. Considerable settlement or misalignment. Considerable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection throughout, extensive corrosion or deep pitting. [4]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:80.6 tons [73.3 metric tons]
Inventory rating:21.6 tons [19.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:46.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$206,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
July 201546.9Structurally deficient---114
July 201446.7Structurally deficient---114
July 201348.1Structurally deficient---40
June 201248.1Structurally deficient---40
July 201148.1Structurally deficient---40
July 201037.8Structurally deficient---36
August 200937.8Structurally deficient---36
September 200837.8Structurally deficient---36
November 200737.8Structurally deficient---36
October 200637.8Structurally deficient---36
October 200537.8Structurally deficient---36
September 200437.8Structurally deficient---36
September 200337.8Structurally deficient---36
August 200241.5Structurally deficient---36
August 200141.5Structurally deficient---36
July 200041.5Structurally deficient---36
July 199937.9Structurally deficient---33
June 199837.9Structurally deficient---33
July 199737.9Structurally deficient---33
July 199640.4Structurally deficient---20
June 199541.9Structurally deficient---20
May 199363.8Structurally deficient---20