WEST SHORE ROAD over MILL NECK CREEK

Map 

Coordinates:
+40.90198, -73.54869
40°54'07" N, 73°32'55" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WEST SHORE ROAD over MILL NECK CREEK
Structure number:000000003300010
Location:AT BAYVILLE
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:89.9 ft. [27.4 m]
Total length:540.7 ft. [164.8 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:42.0 ft. [12.8 m]
Vertical clearance below bridge:11.8 ft. [3.6 m]
Owner:County Highway Agency [02]
Year built:1938
Year reconstructed:1993
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 18 / H 20 [4]
Main span material:Steel [3]
Main span design:Movable - Bascule [16]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,950 [as of 1985]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:61.6 tons [56.0 metric tons]
Inventory rating:28.1 tons [25.5 metric tons]
Sufficiency rating:63.8
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$9,604,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,950 [as of 1985]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge over "tidal" waters that has not been evaluated for scour, but considered low risk. [T]
Operating rating:25.9 tons [23.5 metric tons]
Inventory rating:16.0 tons [14.5 metric tons]
Sufficiency rating:43.8
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$2,671,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:8,950 [as of 1985]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:25.7 tons [23.4 metric tons]
Inventory rating:15.8 tons [14.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:6.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$4,919,000