FOWLERVILLE ROAD over GENESEE RIVER

Map 

Coordinates:
+42.89177, -77.82142
42°53'30" N, 77°49'17" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FOWLERVILLE ROAD over GENESEE RIVER
Structure number:000000003316240
Location:3.3 MI NE OF YORK
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:94.8 ft. [28.9 m]
Total length:303.8 ft. [92.6 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:30.5 ft. [9.3 m]
Owner:County Highway Agency [02]
Year built:1950
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,352 [as of 2008]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:46.9 tons [42.6 metric tons]
Inventory rating:27.9 tons [25.4 metric tons]
Sufficiency rating:62.3
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$3,406,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,170 [as of 1997]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:81.7 tons [74.3 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Sufficiency rating:79.6
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,846,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:600 [as of 1979]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:81.2 tons [73.8 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:73.7