Share:

CR 26 over GENESEE RIVER

Map 

Coordinates:
+42.34324, -78.10319
42°20'36" N, 78°06'11" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CR 26 over GENESEE RIVER
Structure number:000000003330740
Location:0.5 MI.E.OF BELFAST
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:143.7 ft. [43.8 m]
Total length:293.0 ft. [89.3 m]
Roadway width between curbs:33.8 ft. [10.3 m]
Deck width edge-to-edge:35.8 ft. [10.9 m]
Owner:County Highway Agency [02]
Year built:1974
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,516 [as of 2009]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:79.9 tons [72.6 metric tons]
Inventory rating:46.9 tons [42.6 metric tons]
Sufficiency rating:84.3
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$173,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,094 [as of 1996]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:82.7 tons [75.2 metric tons]
Inventory rating:42.9 tons [39.0 metric tons]
Sufficiency rating:96.6
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$4,425,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:800 [as of 1989]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:82.2 tons [74.7 metric tons]
Inventory rating:42.6 tons [38.7 metric tons]
Sufficiency rating:90.7
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$254,000