Share:

COUNTY RD 4 over GENESEE RIVER

Map 

Coordinates:
+42.46349, -78.10334
42°27'49" N, 78°06'12" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:COUNTY RD 4 over GENESEE RIVER
Structure number:000000003330760
Location:0.4 MI SE OF FILLMORE
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:167.0 ft. [50.9 m]
Total length:599.8 ft. [182.8 m]
Roadway width between curbs:33.8 ft. [10.3 m]
Deck width edge-to-edge:35.8 ft. [10.9 m]
Skew angle:52°
Owner:County Highway Agency [02]
Year built:1980
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,057 [as of 2009]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:97.8 tons [88.9 metric tons]
Inventory rating:58.9 tons [53.5 metric tons]
Sufficiency rating:86.5
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$1,466,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,731 [as of 1998]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:88.8 tons [80.7 metric tons]
Inventory rating:54.8 tons [49.8 metric tons]
Sufficiency rating:98.3
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$8,504,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,300 [as of 1990]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:92.1 tons [83.7 metric tons]
Inventory rating:58.4 tons [53.1 metric tons]
Sufficiency rating:98.5
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$3,060,000