Facts 

Name:PIETY HILL ROAD over MEAD BROOK
Structure number:000000003369270
Location:.2 MI W INT NY 41 & CR 51
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:21.0 ft. [6.4 m]
Total length:23.0 ft. [7.0 m]
Roadway width between curbs:21.0 ft. [6.4 m]
Deck width edge-to-edge:24.9 ft. [7.6 m]
Skew angle:26°
Owner:Town or Township Highway Agency [03]
Year built:1997
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Concrete [1]
Main span design:Culvert [19]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: December 2015 

Status:Open, no restriction [A]
Average daily traffic:141 [as of 2015]
Truck traffic:7% of total traffic
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Culvert condition:Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:84.8 tons [77.1 metric tons]
Inventory rating:44.9 tons [40.8 metric tons]
Sufficiency rating:82.9
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$216,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
December 201582.9Not deficient---141
September 201396.9Not deficient---158
October 201196.9Not deficient---160
October 201085.9Not deficient---158
October 200968.9Structurally deficient---158
October 200796.8Not deficient---500
October 200596.8Not deficient---500
August 200397.8Not deficient---500
August 200197.8Not deficient---500
September 199997.8Not deficient---500
July 199798.8Not deficient---500