RTE 915C over CHAMPLAIN CANAL

Map 

Coordinates:
+42.93719, -73.64961
42°56'14" N, 73°38'59" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RTE 915C over CHAMPLAIN CANAL
Structure number:000000004029210
Location:.2 MILE E OF STILLWATER
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:179.8 ft. [54.8 m]
Total length:184.7 ft. [56.3 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:32.8 ft. [10.0 m]
Vertical clearance above deck:14.4 ft. [4.4 m]
Vertical clearance below bridge:19.7 ft. [6.0 m]
Owner:State Highway Agency [01]
Year built:1959
Year reconstructed:1993
Historic significance:Historical significance is not determinable at this time [4]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,653 [as of 1990]
Truck traffic:9% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:76.9 tons [69.9 metric tons]
Inventory rating:45.9 tons [41.7 metric tons]
Sufficiency rating:70.1
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$601,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,653 [as of 1990]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:76.8 tons [69.8 metric tons]
Inventory rating:45.9 tons [41.7 metric tons]
Sufficiency rating:67.0
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$2,497,000

1992 Inspection 

Status:Posted for other load-capacity restriction [R]
Average daily traffic:3,653 [as of 1990]
Truck traffic:6% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:28.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$433,000