COUNTY ROAD 27 over BARGE CANAL

Map 

Coordinates:
+42.94557, -74.28892
42°56'44" N, 74°17'20" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:COUNTY ROAD 27 over BARGE CANAL
Structure number:000000004310090
Location:S TRIBES HILL/N.FT HUNTER
Purpose:Carries highway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:244.8 ft. [74.6 m]
Total length:678.8 ft. [206.9 m]
Roadway width between curbs:18.0 ft. [5.5 m]
Deck width edge-to-edge:19.0 ft. [5.8 m]
Vertical clearance above deck:14.4 ft. [4.4 m]
Vertical clearance below bridge:19.7 ft. [6.0 m]
Owner:Other State Agencies [21]
Year built:1910
Year reconstructed:2003
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Truss - Thru [10]
Deck type:Not applicable [N]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,789 [as of 2008]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:72.8 tons [66.2 metric tons]
Inventory rating:46.9 tons [42.6 metric tons]
Sufficiency rating:59.4
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$4,328,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:2,043 [as of 1996]
Truck traffic:6% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:There are no noticeable or noteworthy deficiencies which affect the condition of the channel. [9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:27.9 tons [25.4 metric tons]
Inventory rating:18.9 tons [17.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:2.0
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$6,910,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:2,602 [as of 1973]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:27.7 tons [25.2 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Evaluation:Structurally deficient [1]
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$4,567,000