BUTTS ROAD over ERIE CANAL

Map 

Coordinates:
+43.24873, -78.16600
43°14'55" N, 78°09'58" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:BUTTS ROAD over ERIE CANAL
Structure number:000000004445100
Location:1.4 MI E JCT BRG C & SH98
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:150.9 ft. [46.0 m]
Total length:188.7 ft. [57.5 m]
Roadway width between curbs:14.4 ft. [4.4 m]
Deck width edge-to-edge:16.1 ft. [4.9 m]
Vertical clearance above deck:13.8 ft. [4.2 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Owner:State Highway Agency [01]
Year built:1912
Year reconstructed:2004
Historic significance:Historical significance is not determinable at this time [4]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Not applicable [N]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:1,047 [as of 2009]
Truck traffic:2% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:30.9 tons [28.1 metric tons]
Inventory rating:15.0 tons [13.6 metric tons]
Sufficiency rating:38.3
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$1,138,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:1,045 [as of 1997]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:22.9 tons [20.8 metric tons]
Inventory rating:14.0 tons [12.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:16.6
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$2,320,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:960 [as of 1980]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:18.8 tons [17.1 metric tons]
Inventory rating:12.9 tons [11.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:13.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,776,000