Facts 

Name:SLAYTON SETTMT RD over ERIE CANAL, SOUTH TRAIL,
Structure number:000000004454060
Location:4 MI W JCT SH271 & CANAL
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:148.0 ft. [45.1 m]
Total length:191.9 ft. [58.5 m]
Roadway width between curbs:14.1 ft. [4.3 m]
Deck width edge-to-edge:16.1 ft. [4.9 m]
Vertical clearance above deck:13.8 ft. [4.2 m]
Vertical clearance below bridge:16.7 ft. [5.1 m]
Owner:State Highway Agency [01]
Year built:1911
Year reconstructed:1993
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:1,026 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:83.2 tons [75.6 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.8
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$2,609,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:1,028 [as of 1996]
Truck traffic:6% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Excellent [9 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:40.8 tons [37.1 metric tons]
Inventory rating:24.9 tons [22.6 metric tons]
Sufficiency rating:19.0
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$1,932,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:620 [as of 1974]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:22.8 tons [20.7 metric tons]
Inventory rating:14.9 tons [13.5 metric tons]
Evaluation:Structurally deficient [1]
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,307,000