Facts 

Name:CROSS BAY BR EXIT over JAMAICA BAY
Structure number:00000000552123E
Location:RAMP ATTACH TO 55123D SN3
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Tolls:Yes [1]
Length of largest span:129.9 ft. [39.6 m]
Total length:575.8 ft. [175.5 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:26.2 ft. [8.0 m]
Vertical clearance above deck:19.7 ft. [6.0 m]
Vertical clearance below bridge:42.0 ft. [12.8 m]
Skew angle:99°
Owner:Local Toll Authority [32]
Year built:1967
Year reconstructed:2011
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:6
Main spans material:Prestressed concrete [5]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: September 2015 

Status:Open, no restriction [A]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:62.9 tons [57.2 metric tons]
Inventory rating:38.0 tons [34.5 metric tons]
Sufficiency rating:87.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$393,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
September 201587.0Not deficientFairFairSatisfactory-
September 201382.8Not deficientFairFairSatisfactory2700
September 201182.8Functionally obsoleteFairFairSatisfactory2700
September 200983.8Functionally obsoleteSatisfactorySatisfactoryFair2700
August 200783.8Functionally obsoleteSatisfactorySatisfactoryFair2700
July 200583.8Functionally obsoleteSatisfactorySatisfactoryFair2700
August 200383.8Functionally obsoleteSatisfactorySatisfactoryFair2700
July 200183.8Functionally obsoleteSatisfactorySatisfactoryFair2700
June 199983.8Functionally obsoleteSatisfactorySatisfactoryFair2700
May 199780.7Functionally obsoleteFairFairFair2700
October 199562.0Structurally deficientPoorPoorPoor2700
July 199462.0Structurally deficientPoorPoorPoor2700
June 199246.2Structurally deficientPoorPoorPoor2700
June 199046.2Structurally deficientPoorPoorPoor2700