Share:

CRS ISLND PARKWAY over CIP SERVICE ROAD

Map 

Coordinates:
+40.78893, -73.78985
40°47'20" N, 73°47'23" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:CRS ISLND PARKWAY over CIP SERVICE ROAD
Structure number:00000000552126A
Location:I295 OVER EAST RIVER
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Tolls:Yes [1]
Length of largest span:111.9 ft. [34.1 m]
Total length:797.9 ft. [243.2 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:30.5 ft. [9.3 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Owner:Local Toll Authority [32]
Year built:1961
Year reconstructed:1995
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:9
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

Latest Available Inspection: July 2015 

Status:Open, no restriction [A]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Roadway alignment appraisal:Superior to present desirable criteria [9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.8 tons [55.3 metric tons]
Inventory rating:38.0 tons [34.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$1,035,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
July 201579.0Functionally obsoleteSatisfactorySatisfactoryFair-
August 201359.8Functionally obsoleteGoodSatisfactoryFair11291
August 201159.8Functionally obsoleteGoodGoodFair11291
August 200959.8Functionally obsoleteGoodGoodFair11291
August 200759.8Functionally obsoleteGoodGoodFair11291
August 200559.8Functionally obsoleteGoodGoodFair11291
July 200358.8Functionally obsoleteGoodGoodFair11291
July 200158.8Functionally obsoleteGoodGoodFair11291
August 199956.8Functionally obsoleteGoodGoodFair11291
July 199757.1Functionally obsoleteGoodSatisfactoryFair10930
October 199539.5Structurally deficientVery GoodFairPoor10930
August 199434.0Structurally deficientSeriousPoorPoor23500
June 199234.0Structurally deficientSeriousFairPoor23500
October 199038.0Structurally deficientFairFairPoor23500