OUTBOUND RAMP BR over ARRIVAL&DEPARTURE
Map
Coordinates:
+40.77355, -73.8741240°46'25" N, 73°52'27" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | OUTBOUND RAMP BR over ARRIVAL&DEPARTURE |
| Structure number: | 000000005522270 |
| Location: | AT LA GUARDIA AIRPORT |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 67.9 ft. [20.7 m] |
| Total length: | 344.8 ft. [105.1 m] |
| Roadway width between curbs: | 16.7 ft. [5.1 m] |
| Deck width edge-to-edge: | 21.0 ft. [6.4 m] |
| Vertical clearance above deck: | 7.9 ft. [2.4 m] |
| Vertical clearance below bridge: | 12.1 ft. [3.7 m] |
| Owner: | Local Toll Authority [32] |
| Year built: | 1973 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Number of main spans: | 9 |
| Main spans material: | Concrete [1] |
| Main spans design: | Tee beam [04] |
| Deck type: | Not applicable [N] |
| Wearing surface: | Integral Concrete (separate non-modified layer of concrete added to structural deck) [2] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,600 [as of 1992] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 82.0 tons [74.5 metric tons] |
| Inventory rating: | 35.9 tons [32.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 71.0 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $4,196,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,600 [as of 1992] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 81.7 tons [74.3 metric tons] |
| Inventory rating: | 35.9 tons [32.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 71.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $1,954,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,500 [as of 1991] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 80.2 tons [72.9 metric tons] |
| Inventory rating: | 31.7 tons [28.8 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 53.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $440,000 |