EAST BUS RAMP over I 95 EASTBOUND UL
Map
Coordinates:
+40.84879, -73.9391440°50'56" N, 73°56'21" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | EAST BUS RAMP over I 95 EASTBOUND UL |
| Structure number: | 00000000552250I |
| Location: | 95I OVER HUDSON RIVER |
| Purpose: | Carries highway over highway |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 47.9 ft. [14.6 m] |
| Total length: | 387.8 ft. [118.2 m] |
| Roadway width between curbs: | 19.7 ft. [6.0 m] |
| Deck width edge-to-edge: | 24.3 ft. [7.4 m] |
| Vertical clearance below bridge: | 17.4 ft. [5.3 m] |
| Owner: | Local Toll Authority [32] |
| Year built: | 1962 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Number of main spans: | 12 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Latex Concrete or similar additive [3] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 150 [as of 2009] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 87.0 tons [79.1 metric tons] |
| Inventory rating: | 35.9 tons [32.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 90.0 |
| Recommended work: | Bridge deck rehabilitation with only incidental widening. [36] |
| Estimated cost of work: | $1,550,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,000 [as of 1973] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 86.8 tons [78.9 metric tons] |
| Inventory rating: | 35.9 tons [32.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 89.9 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $2,542,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,000 [as of 1973] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 85.1 tons [77.4 metric tons] |
| Inventory rating: | 31.7 tons [28.8 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 44.6 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $582,000 |