Facts 

Name:TOWNSHIP ROAD 365 over MOHICAN RIVER
Structure number:1630016
Location:200 FT WEST OF CAVALLO
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:104.0 ft. [31.7 m]
Total length:199.2 ft. [60.7 m]
Roadway width between curbs:16.1 ft. [4.9 m]
Deck width edge-to-edge:19.0 ft. [5.8 m]
Owner:County Highway Agency [02]
Year built:1912
Year reconstructed:1993
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Truss - Thru [10]
Deck type:Corrugated Steel [6]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1 [as of 1993]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$376,000

2000 Inspection 

Status:Open, no restriction [A]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:78.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$376,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:180 [as of 1978]
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:5.9 tons [5.4 metric tons]
Inventory rating:5.0 tons [4.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:20.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$376,000