I-71 over NSC RR & RTA89

Map 

Coordinates:
+41.43750, -81.80889
41°26'15" N, 81°48'32" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-71 over NSC RR & RTA89
Structure number:1804774
Location:1.46 MI. N. OF JCT. I-480
Purpose:Carries highway over railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:136.2 ft. [41.5 m]
Total length:226.1 ft. [68.9 m]
Roadway width between curbs:141.7 ft. [43.2 m]
Deck width edge-to-edge:147.6 ft. [45.0 m]
Vertical clearance below bridge:23.0 ft. [7.0 m]
Skew angle:64°
Owner:State Highway Agency [01]
Year built:1966
Year reconstructed:2000
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:108,744 [as of 2007]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:78.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$1,821,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:94,576 [as of 1991]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:43.6 tons [39.6 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Sufficiency rating:68.8
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$1,821,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:91,882 [as of 1988]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Sufficiency rating:69.8