EXIT RAMP SN over W 154 ST NB RMP FROM I71
Map
Coordinates:
+41.43861, -81.8038941°26'19" N, 81°48'14" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | EXIT RAMP SN over W 154 ST NB RMP FROM I71 |
| Structure number: | 1804863 |
| Location: | 1.73 MI. N. OF JCT. I-480 |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 44.9 ft. [13.7 m] |
| Total length: | 109.9 ft. [33.5 m] |
| Roadway width between curbs: | 25.9 ft. [7.9 m] |
| Deck width edge-to-edge: | 29.9 ft. [9.1 m] |
| Vertical clearance below bridge: | 14.1 ft. [4.3 m] |
| Skew angle: | 17° |
| Owner: | State Highway Agency [01] |
| Year built: | 1967 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 3 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Low slump Concrete [4] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 46,295 [as of 1988] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 44.6 tons [40.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 57.0 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $178,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 46,295 [as of 1988] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 44.6 tons [40.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 78.8 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $178,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 46,295 [as of 1988] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 94.4 |