SR-14 over 77-1409 (BROADWAY AVE.)
Map
Coordinates:
+41.47583, -81.6602841°28'33" N, 81°39'37" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | SR-14 over 77-1409 (BROADWAY AVE.) |
| Structure number: | 1806661 |
| Location: | JCT. SR-14 AT I-77 |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 171.9 ft. [52.4 m] |
| Total length: | 296.9 ft. [90.5 m] |
| Roadway width between curbs: | 45.9 ft. [14.0 m] |
| Deck width edge-to-edge: | 60.7 ft. [18.5 m] |
| Vertical clearance below bridge: | 15.1 ft. [4.6 m] |
| Skew angle: | 63° |
| Owner: | State Highway Agency [01] |
| Year built: | 1963 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 18 / H 20 [4] |
| Number of main spans: | 2 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Integral Concrete (separate non-modified layer of concrete added to structural deck) [2] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 22,170 [as of 2007] |
| Truck traffic: | 15% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 36.6 tons [33.3 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 66.3 |
| Recommended work: | Bridge deck rehabilitation with only incidental widening. [36] |
| Estimated cost of work: | $1,100,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,258 [as of 1991] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 36.6 tons [33.3 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 67.6 |
| Recommended work: | Bridge deck rehabilitation with only incidental widening. [36] |
| Estimated cost of work: | $1,100,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,125 [as of 1988] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 64.9 |