I-70 over 70WB OVER SCIOTO RIVER
Map
Coordinates:
+39.95139, -83.0136139°57'05" N, 83°00'49" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-70 over 70WB OVER SCIOTO RIVER |
| Structure number: | 2504413 |
| Location: | 0.21 MI E OF I-71 |
| Purpose: | Carries highway over waterway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 113.2 ft. [34.5 m] |
| Total length: | 897.4 ft. [273.5 m] |
| Roadway width between curbs: | 72.5 ft. [22.1 m] |
| Deck width edge-to-edge: | 76.1 ft. [23.2 m] |
| Skew angle: | 40° |
| Owner: | State Highway Agency [01] |
| Year built: | 1974 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 9 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 66,960 [as of 2006] |
| Truck traffic: | 14% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | There are no noticeable or noteworthy deficiencies which affect the condition of the channel. [9] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 72.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 74,775 [as of 1995] |
| Truck traffic: | 12% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 91.0 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 68,985 [as of 1990] |
| Truck traffic: | 12% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 81.1 |