SR 822(FT.STEUBEN) over OVER SR7NB,RR,OHIO R.

Map 

Coordinates:
+40.37778, -80.61500
40°22'40" N, 80°36'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR 822(FT.STEUBEN) over OVER SR7NB,RR,OHIO R.
Structure number:4101987
Location:1.47MI.N.OF MARKET ST BR
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:689.0 ft. [210.0 m]
Total length:1585.1 ft. [483.1 m]
Roadway width between curbs:20.3 ft. [6.2 m]
Deck width edge-to-edge:24.0 ft. [7.3 m]
Vertical clearance above deck:19.7 ft. [6.0 m]
Vertical clearance below bridge:86.0 ft. [26.2 m]
Owner:State Highway Agency [01]
Year built:1928
Year reconstructed:1972
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Suspension [13]
Deck type:Closed Grating [4]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Bridge closed to all traffic [K]
Average daily traffic:1,900 [as of 2007]
Truck traffic:2% of total traffic
Deck condition:Critical [2 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Evaluation:Structurally deficient [1]
Sufficiency rating:9.4
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$200,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,910 [as of 1996]
Truck traffic:17% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:28.7 tons [26.1 metric tons]
Inventory rating:9.9 tons [9.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:2.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,902,000

1992 Inspection 

Status:Bridge closed to all traffic [K]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Evaluation:Structurally deficient [1]
Sufficiency rating:30.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$1,902,000