Facts 

Name:FAU 1492 (COUNTRY over POTEAU RIVER
Structure number:011700000000000
Old structure number:40E1296N4707000 (from 1992 edition)
Location:1.1 MI E SHADYPOINT
Purpose:Carries highway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:200.1 ft. [61.0 m]
Total length:350.1 ft. [106.7 m]
Roadway width between curbs:15.7 ft. [4.8 m]
Deck width edge-to-edge:16.1 ft. [4.9 m]
Vertical clearance above deck:15.7 ft. [4.8 m]
Owner:City or Municipal Highway Agency [04]
Year built:1920
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 9 / H 10 [1]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:175 [as of 2008]
Truck traffic:5% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Critical [2 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:16.6 tons [15.1 metric tons]
Inventory rating:10.0 tons [9.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:24.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$499,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:175 [as of 1999]
Truck traffic:7% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:23.8 tons [21.6 metric tons]
Inventory rating:18.6 tons [16.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:18.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$629,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:175 [as of 1986]
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:32.2 tons [29.3 metric tons]
Inventory rating:17.4 tons [15.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:37.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$276,000