E0870 over CHECKER BOARD CREEK
Map
Coordinates:
+35.75550, -96.1226335°45'20" N, 96°07'21" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | E0870 over CHECKER BOARD CREEK |
| Structure number: | 022440000000000 |
| Location: | 3.9 E, 1.0 N SH16-CRK C/L |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Rural) [09] |
| Length of largest span: | 36.1 ft. [11.0 m] |
| Total length: | 36.1 ft. [11.0 m] |
| Roadway width between curbs: | 13.8 ft. [4.2 m] |
| Deck width edge-to-edge: | 15.1 ft. [4.6 m] |
| Owner: | County Highway Agency [02] |
| Year built: | 1929 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Main span material: | Steel [3] |
| Main span design: | Truss - Thru [10] |
| Deck type: | Wood or Timber [8] |
| Wearing surface: | Gravel [8] |
2010 Inspection
| Status: | Bridge closed to all traffic [K] |
| Average daily traffic: | 100 [as of 2008] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Serious [3 out of 9] |
| Substructure condition: | Serious [3 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 15.8 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $225,000 |
2000 Inspection
| Status: | Open, posting recommended but not legally implemented [B] |
| Average daily traffic: | 100 [as of 1999] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 3.0 tons [2.7 metric tons] |
| Inventory rating: | 2.5 tons [2.3 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 19.5 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $184,000 |