E0870 over CHECKER BOARD CREEK

Map 

Coordinates:
+35.75550, -96.12263
35°45'20" N, 96°07'21" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:E0870 over CHECKER BOARD CREEK
Structure number:022440000000000
Location:3.9 E, 1.0 N SH16-CRK C/L
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:36.1 ft. [11.0 m]
Total length:36.1 ft. [11.0 m]
Roadway width between curbs:13.8 ft. [4.2 m]
Deck width edge-to-edge:15.1 ft. [4.6 m]
Owner:County Highway Agency [02]
Year built:1929
Historic significance:Historical significance is not determinable at this time [4]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Wood or Timber [8]
Wearing surface:Gravel [8]

2010 Inspection 

Status:Bridge closed to all traffic [K]
Average daily traffic:100 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Evaluation:Structurally deficient [1]
Sufficiency rating:15.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$225,000

2000 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:100 [as of 1999]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:3.0 tons [2.7 metric tons]
Inventory rating:2.5 tons [2.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:19.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$184,000