Facts 

Name:E0930 over CREEK
Structure number:023230000000000
Location:1N, 2E OF BOYNTON
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:78.1 ft. [23.8 m]
Total length:80.1 ft. [24.4 m]
Roadway width between curbs:13.8 ft. [4.2 m]
Deck width edge-to-edge:13.8 ft. [4.2 m]
Owner:County Highway Agency [02]
Year built:1911
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:100 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:7.9 tons [7.2 metric tons]
Inventory rating:5.5 tons [5.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:17.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$225,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:100 [as of 1999]
Truck traffic:5% of total traffic
Deck condition:Critical [2 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:4.0 tons [3.6 metric tons]
Inventory rating:3.7 tons [3.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:15.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$272,000