U.S. 70 over WHISKEY CREEK

Map 

Coordinates:
+34.08324, -96.76802
34°04'60" N, 96°46'05" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:U.S. 70 over WHISKEY CREEK
Structure number:040130000000000
Old structure number:4804 0054 X (from 1992 edition)
Location:0.2 MI SE MADILL
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other (Rural) [02]
Length of largest span:29.9 ft. [9.1 m]
Total length:90.9 ft. [27.7 m]
Roadway width between curbs:52.2 ft. [15.9 m]
Deck width edge-to-edge:60.0 ft. [18.3 m]
Owner:State Highway Agency [01]
Year built:1933
Year reconstructed:1959
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 18 / H 20 [4]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,900 [as of 2008]
Truck traffic:25% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:51.9 tons [47.2 metric tons]
Inventory rating:31.1 tons [28.3 metric tons]
Sufficiency rating:84.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,907,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,610 [as of 1999]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Sufficiency rating:45.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,872,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,900 [as of 1989]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:30.9 tons [28.1 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Sufficiency rating:61.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$817,000