5328C over FOUR MILE CREEK

Map 

Coordinates:
+36.62431, -95.77382
36°37'28" N, 95°46'26" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:5328C over FOUR MILE CREEK
Structure number:105800000000000
Old structure number:53N4060E0260005 (from 1992 edition)
Location:12. 0 MI SW OF NOWATA
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:11.2 ft. [3.4 m]
Total length:26.9 ft. [8.2 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:26.9 ft. [8.2 m]
Owner:County Highway Agency [02]
Year built:1947
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 9 / H 10 [1]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:100 [as of 2008]
Truck traffic:15% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:25.2 tons [22.9 metric tons]
Inventory rating:15.1 tons [13.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:37.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$251,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:100 [as of 1999]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:18.8 tons [17.1 metric tons]
Inventory rating:16.1 tons [14.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:47.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$176,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:100 [as of 1989]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:23.5 tons [21.4 metric tons]
Inventory rating:16.1 tons [14.6 metric tons]
Sufficiency rating:66.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$200,000