E0280 over BIRD'S NEST CREEK

Map 

Coordinates:
+36.60825, -97.27730
36°36'30" N, 97°16'38" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:E0280 over BIRD'S NEST CREEK
Structure number:123850000000000
Location:1N .3E of THREE SANDS
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:89.9 ft. [27.4 m]
Total length:91.9 ft. [28.0 m]
Roadway width between curbs:18.0 ft. [5.5 m]
Deck width edge-to-edge:18.0 ft. [5.5 m]
Owner:County Highway Agency [02]
Year built:1915
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:50 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:5.0 tons [4.5 metric tons]
Inventory rating:4.0 tons [3.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:34.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$485,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:50 [as of 1999]
Deck condition:Good [7 out of 9]
Superstructure condition:Critical [2 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:7.9 tons [7.2 metric tons]
Inventory rating:7.5 tons [6.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:34.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$289,000