S.H. 199 over WASHITA RIVER

Map 

Coordinates:
+34.09655, -96.55361
34°05'48" N, 96°33'13" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:S.H. 199 over WASHITA RIVER
Structure number:124850000000000
Location:4.0 MI W JCT SH78
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:212.0 ft. [64.6 m]
Total length:538.1 ft. [164.0 m]
Roadway width between curbs:22.3 ft. [6.8 m]
Deck width edge-to-edge:23.0 ft. [7.0 m]
Vertical clearance above deck:15.1 ft. [4.6 m]
Owner:State Highway Agency [01]
Year built:1950
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:4
Main spans material:Steel [3]
Main spans design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:950 [as of 2008]
Truck traffic:12% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:14.0 tons [12.7 metric tons]
Inventory rating:7.7 tons [7.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:11.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,429,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:710 [as of 1999]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:19.8 tons [18.0 metric tons]
Inventory rating:18.6 tons [16.9 metric tons]
Sufficiency rating:48.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,706,000