Facts 

Name:WILL ROGERS TPI-44 over FIVE MILE CREEK
Structure number:139180000000000
Old structure number:5801T3020 X (from 1992 edition)
Location:87.36 MI NE OF TP GATE
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Rural) [01]
Tolls:Yes, on toll road [2]
Length of largest span:47.9 ft. [14.6 m]
Total length:48.9 ft. [14.9 m]
Roadway width between curbs:69.6 ft. [21.2 m]
Deck width edge-to-edge:74.8 ft. [22.8 m]
Owner:State Toll Authority [31]
Year built:1957
Year reconstructed:2000
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Truss - Deck [09]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:21,000 [as of 2008]
Truck traffic:36% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:49.0 tons [44.5 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:79.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,997,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,840 [as of 1999]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:78.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,950,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,170 [as of 1989]
Truck traffic:15% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:73.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,629,000