S.H. 99 over B.N. & S.F. R.R. UNDER

Map 

Coordinates:
+36.22429, -96.57176
36°13'27" N, 96°34'18" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:S.H. 99 over B.N. & S.F. R.R. UNDER
Structure number:187440000000000
Location:4.3 MI N CREEK CO.
Purpose:Carries highway over railroad
Route classification:Minor Arterial (Rural) [06]
Length of largest span:63.0 ft. [19.2 m]
Total length:168.0 ft. [51.2 m]
Roadway width between curbs:46.6 ft. [14.2 m]
Deck width edge-to-edge:49.5 ft. [15.1 m]
Vertical clearance below bridge:24.3 ft. [7.4 m]
Skew angle:35°
Owner:State Highway Agency [01]
Year built:1974
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,600 [as of 2008]
Truck traffic:16% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:80.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,923,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,620 [as of 1999]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:91.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,109,000