Share:

OR 99E (HWY001E)CO over HWY 2 & UPRR

Map 

Coordinates:
+45.52541, -122.66169
45°31'31" N, 122°39'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:OR 99E (HWY001E)CO over HWY 2 & UPRR
Structure number:02350A01EX00020
Location:0.1 MI E PORTLAND CC
Purpose:Carries highway and pedestrian walkway over highway and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:89.9 ft. [27.4 m]
Total length:463.9 ft. [141.4 m]
Roadway width between curbs:56.1 ft. [17.1 m]
Deck width edge-to-edge:80.1 ft. [24.4 m]
Vertical clearance below bridge:18.4 ft. [5.6 m]
Owner:State Highway Agency [01]
Year built:1908
Year reconstructed:1960
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Design load:M 13.5 / H 15 [2]
Number of main spans:11
Main spans material:Steel [3]
Main spans design:Girder and floorbeam system [03]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,502 [as of 2008]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:32.9 tons [29.9 metric tons]
Inventory rating:19.9 tons [18.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:57.9
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$6,177,000

2000 Inspection 

Average daily traffic:121,800 [as of 2000]
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:26,300 [as of 1989]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:27.3 tons [24.8 metric tons]
Inventory rating:18.6 tons [16.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:72.0