OR 99E (HWY001E)CO over HWY 2 & UPRR
Map
Coordinates:
+45.52541, -122.6616945°31'31" N, 122°39'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | OR 99E (HWY001E)CO over HWY 2 & UPRR |
| Structure number: | 02350A01EX00020 |
| Location: | 0.1 MI E PORTLAND CC |
| Purpose: | Carries highway and pedestrian walkway over highway and railroad |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 89.9 ft. [27.4 m] |
| Total length: | 463.9 ft. [141.4 m] |
| Roadway width between curbs: | 56.1 ft. [17.1 m] |
| Deck width edge-to-edge: | 80.1 ft. [24.4 m] |
| Vertical clearance below bridge: | 18.4 ft. [5.6 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1908 |
| Year reconstructed: | 1960 |
| Historic significance: | Bridge is possibly eligible for the National Register of Historic Places [3] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 11 |
| Main spans material: | Steel [3] |
| Main spans design: | Girder and floorbeam system [03] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 28,502 [as of 2008] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 32.9 tons [29.9 metric tons] |
| Inventory rating: | 19.9 tons [18.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 57.9 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $6,177,000 |
2000 Inspection
| Average daily traffic: | 121,800 [as of 2000] |
| Evaluation: | Not applicable [N] |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 26,300 [as of 1989] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 27.3 tons [24.8 metric tons] |
| Inventory rating: | 18.6 tons [16.9 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 72.0 |