Share:

HAWTHORNE AVE over WILLAMETTE RIVER

Map 

Coordinates:
+45.51321, -122.67095
45°30'48" N, 122°40'15" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:HAWTHORNE AVE over WILLAMETTE RIVER
Structure number:02757 000000000
Location:WILLAMETTE RIVER MP 13.2
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:251.0 ft. [76.5 m]
Total length:1382.9 ft. [421.5 m]
Roadway width between curbs:43.6 ft. [13.3 m]
Deck width edge-to-edge:73.2 ft. [22.3 m]
Vertical clearance above deck:15.7 ft. [4.8 m]
Vertical clearance below bridge:109.9 ft. [33.5 m]
Owner:County Highway Agency [02]
Year built:1910
Year reconstructed:1997
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Main span material:Steel [3]
Main span design:Movable - Lift [15]
Deck type:Open Grating [3]
Wearing surface:Other [9]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:25,610 [as of 2006]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:57.9 tons [52.6 metric tons]
Inventory rating:35.0 tons [31.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:68.2
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$7,086,000

2000 Inspection 

Status:New structure not yet open to traffic [G]
Average daily traffic:12,882 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:57.4 tons [52.2 metric tons]
Inventory rating:34.7 tons [31.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:70.4
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$11,312,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:25,700 [as of 1990]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Operating rating:33.7 tons [30.6 metric tons]
Inventory rating:21.8 tons [19.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:52.3