Share:

HAWTHORNE BR. W.A. over WILLAMETTE RIVER

Map 

Coordinates:
+45.51294, -122.66584
45°30'47" N, 122°39'57" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:HAWTHORNE BR. W.A. over WILLAMETTE RIVER
Structure number:02757D000000000
Location:WILLAMETTE RIVER MO 13.2
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:58.1 ft. [17.7 m]
Total length:331.1 ft. [100.9 m]
Roadway width between curbs:64.0 ft. [19.5 m]
Deck width edge-to-edge:81.0 ft. [24.7 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Owner:County Highway Agency [02]
Year built:1958
Historic significance:Historical significance is not determinable at this time [4]
Number of main spans:13
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:25,866 [as of 2007]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:74.8 tons [68.0 metric tons]
Inventory rating:16.9 tons [15.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:60.5
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$4,462,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,882 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:74.2 tons [67.5 metric tons]
Inventory rating:16.8 tons [15.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:52.5
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$3,433,000