HAWTHORNE BR. W.A. over WILLAMETTE RIVER
Map
Coordinates:
+45.51294, -122.6658445°30'47" N, 122°39'57" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | HAWTHORNE BR. W.A. over WILLAMETTE RIVER |
| Structure number: | 02757D000000000 |
| Location: | WILLAMETTE RIVER MO 13.2 |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 58.1 ft. [17.7 m] |
| Total length: | 331.1 ft. [100.9 m] |
| Roadway width between curbs: | 64.0 ft. [19.5 m] |
| Deck width edge-to-edge: | 81.0 ft. [24.7 m] |
| Vertical clearance below bridge: | 14.4 ft. [4.4 m] |
| Owner: | County Highway Agency [02] |
| Year built: | 1958 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Number of main spans: | 13 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 25,866 [as of 2007] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 74.8 tons [68.0 metric tons] |
| Inventory rating: | 16.9 tons [15.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 60.5 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $4,462,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 12,882 [as of 1998] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 74.2 tons [67.5 metric tons] |
| Inventory rating: | 16.8 tons [15.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 52.5 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $3,433,000 |