HOLLY LN over ABERNETHY CREEK

Map 

Coordinates:
+45.35963, -122.57086
45°21'35" N, 122°34'15" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:HOLLY LN over ABERNETHY CREEK
Structure number:06217 060 00184
Location:150 FT S OF REDLAND
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:100.1 ft. [30.5 m]
Total length:100.1 ft. [30.5 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:32.5 ft. [9.9 m]
Owner:County Highway Agency [02]
Year built:1933
Year reconstructed:1967
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:2,986 [as of 2007]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:37.0 tons [33.6 metric tons]
Inventory rating:22.0 tons [20.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:58.8
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$512,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,706 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:36.6 tons [33.3 metric tons]
Inventory rating:21.8 tons [19.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:62.7
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$468,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,500 [as of 1991]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:25.3 tons [23.0 metric tons]
Inventory rating:25.3 tons [23.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:68.9
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$425,000