Share:

ARRAH WANNA BLVD over SALMON RIVER

Map 

Coordinates:
+45.33858, -121.97367
45°20'19" N, 121°58'25" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ARRAH WANNA BLVD over SALMON RIVER
Structure number:06572 003 00092
Location:0.9 MI S OF HWY 26
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:100.1 ft. [30.5 m]
Total length:117.1 ft. [35.7 m]
Roadway width between curbs:15.1 ft. [4.6 m]
Deck width edge-to-edge:16.1 ft. [4.9 m]
Owner:County Highway Agency [02]
Year built:1957
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Wood or Timber [8]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:237 [as of 2007]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:22.0 tons [20.0 metric tons]
Inventory rating:13.0 tons [11.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:27.9
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$599,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:216 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge is scour critical; field review indicates that extensive scour has occurred at bridge foundations. [2]
Operating rating:21.8 tons [19.8 metric tons]
Inventory rating:12.9 tons [11.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:40.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$263,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:200 [as of 1991]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:29.7 tons [27.0 metric tons]
Inventory rating:18.6 tons [16.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:34.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$6,000