OR 43 (HWY 003) SB over PEDESTRIAN PATH
Map
Coordinates:
+45.46471, -122.6686145°27'53" N, 122°40'07" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | OR 43 (HWY 003) SB over PEDESTRIAN PATH |
| Structure number: | 06879B000300269 |
| Location: | WILLAMETTE RIVER MP 165 |
| Purpose: | Carries highway over pedestrian/bicycle trail |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 23.0 ft. [7.0 m] |
| Total length: | 25.9 ft. [7.9 m] |
| Roadway width between curbs: | 22.0 ft. [6.7 m] |
| Deck width edge-to-edge: | 25.3 ft. [7.7 m] |
| Skew angle: | 17° |
| Owner: | County Highway Agency [02] |
| Year built: | 1981 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Concrete [1] |
| Main span design: | Frame [07] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,346 [as of 2007] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.8 tons [54.4 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 83.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $133,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 4,845 [as of 1998] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 42.6 tons [38.7 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 85.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $92,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,260 [as of 1989] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 42.6 tons [38.7 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 96.0 |