Share:

HWY 1W over WB HWY 26

Map 

Coordinates:
+45.50011, -122.67768
45°30'00" N, 122°40'40" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:HWY 1W over WB HWY 26
Structure number:06896 01W 00161
Location:1.5 MI S PORTLAND CC
Purpose:Carries highway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:35.1 ft. [10.7 m]
Total length:35.1 ft. [10.7 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:64.6 ft. [19.7 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Owner:State Highway Agency [01]
Year built:1946
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Concrete [1]
Main span design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,700 [as of 2008]
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.8 tons [55.3 metric tons]
Inventory rating:37.0 tons [33.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:91.2
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$179,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:19,300 [as of 1998]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:36.6 tons [33.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:84.9
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$290,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,500 [as of 1990]
Truck traffic:12% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:84.4