NE 21ST AVE over B-26A X I-84 & MAX
Map
Coordinates:
+45.52990, -122.6448845°31'48" N, 122°38'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | NE 21ST AVE over B-26A X I-84 & MAX |
| Structure number: | 07035C000000000 |
| Location: | 4 BLOCKS S OF HALSEY ST |
| Purpose: | Carries highway and pedestrian walkway over highway and railroad |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 64.0 ft. [19.5 m] |
| Total length: | 204.1 ft. [62.2 m] |
| Roadway width between curbs: | 44.0 ft. [13.4 m] |
| Deck width edge-to-edge: | 60.7 ft. [18.5 m] |
| Vertical clearance below bridge: | 22.6 ft. [6.9 m] |
| Skew angle: | 4° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1986 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Precast Panels [2] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,614 [as of 2006] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.8 tons [54.4 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 93.0 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $2,065,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,000 [as of 1996] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Excellent [9 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 49.5 tons [45.0 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 94.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $2,900,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 12,600 [as of 1989] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Excellent [9 out of 9] |
| Superstructure condition: | Excellent [9 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 49.5 tons [45.0 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 76.7 |