I-5 (HWY 001) over WILLAMETTE RIVER MARQUAM

Map 

Coordinates:
+45.50676, -122.67095
45°30'24" N, 122°40'15" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-5 (HWY 001) over WILLAMETTE RIVER MARQUAM
Structure number:08328 001 30038
Location:1.1 MI S OF BURNSIDE BR
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:440.0 ft. [134.1 m]
Total length:1044.0 ft. [318.2 m]
Roadway width between curbs:113.9 ft. [34.7 m]
Deck width edge-to-edge:168.0 ft. [51.2 m]
Vertical clearance above deck:15.4 ft. [4.7 m]
Vertical clearance below bridge:71.9 ft. [21.9 m]
Owner:State Highway Agency [01]
Year built:1966
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Truss - Deck [09]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:135,900 [as of 2008]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:59.8 tons [54.4 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:54.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$5,883,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:131,800 [as of 1997]
Truck traffic:17% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:57.4 tons [52.2 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:81.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:101,900 [as of 1990]
Truck traffic:17% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:None present but re-evaluation suggested [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:57.4 tons [52.2 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:63.0